Example of Shimizu Tunnel No 3 in UDEC 7.00

Programvara

Version Notes:
UDEC 7.00

Level: Intermediate
Runs in Demo: No

Write Up
Walk Through
Project Files
Konsulttjänster
This example demonstrates the use of UDEC to model a tunnel excavation in a jointed rock mass.

This example demonstrates the use of UDEC to model a tunnel excavation in jointed rock mass. In this demonstration, geometry sets are used to create the tunnel geometry. The Barton Bandis model is used to represent the joints. The "block solve relax" command is used to simulate the pre-relaxation of the rock mass while excavating the tunnel.

Keywords

  • Geometry sets
  • Barton-Bandis
  • Ground reaction curve
  • Shotcrete
  • Bolt
Senaste nytt
  • ITASCA Strengthens North American Delivery of Integrated Geomechanics and Hydrogeology Solutions Drawing on decades of geomechanical and hydrogeological expertise, ITASCA has announced the formation of ITASCA...
    Läs mer
  • Från arkitektdröm till bergmekanik – Adina Sköld stärker ITASCA i Luleå Hon sa aldrig Luleå. Aldrig jord och berg. Det var arkitekt hon skulle bli. I...
    Läs mer
  • Operativ bergmekanik På ITASCA gillar vi en blandning av fältjobb och analyser. Vi erbjuder stöd inom operativ...
    Läs mer

Kommande händelser
17 nov.
Visit ITASCA at Ground Support 2026
ITASCA will be participating in Ground Support 2026, the conference dedicated to ground support in mining and civil engineering, taking... Läs mer