Lined Tunnel Construction in Saturated Ground

Programvara

Version Notes:
FLAC 8.0

Level: Advanced
Runs in Demo: No

Write Up
Walk Through
Project Files
Konsulttjänster

A circular lined tunnel is constructed in saturated ground. The ground is dewatered during construction. The tunnel is supported by a temporary shotcrete liner, which is installed while the tunnel excavation is advanced. A final cast-in-place concrete liner is then constructed. The water level is then returned to the original level. The analysis determines the forces and moments that develop in the concrete liner when the water level is returned to the original level, and when the temporary shotcrete liner loses strength.

Keywords:

  • Circular
  • Tunnel
  • Saturated soil
  • Dewatering
  • shotcrete
  • concrete
  • liner

Materials:

  • Concrete
  • Soil
  • Water

Analyses:

  • Fluid Flow
  • Static
Senaste nytt
  • Operativ bergmekanik På ITASCA gillar vi en blandning av fältjobb och analyser. Vi erbjuder stöd inom operativ...
    Läs mer
  • Jennifer firar fem år med strategisk roll ...
    Läs mer
  • Axel tillbaka med nya perspektiv ...
    Läs mer

Kommande händelser
23 sep.
Getting Started with FLAC2D/FLAC3D
This training is an introduction to continuous modeling with FLAC2D and FLAC3D. At the end of the course, participants will master the ... Läs mer
14 okt.
Getting Started with 3DEC
Live Online Introductory Training Course. October 14-15, 2025... Läs mer
2 dec.
NEW TRAINING: Meshing in ITASCA Software
This introductory training course offers a comprehensive foundation in geotechnical modeling, enabling participants to identify various... Läs mer