Lined Tunnel Construction in Saturated Ground

Programvara

Version Notes:
FLAC 8.0

Level: Advanced
Runs in Demo: No

Write Up
Walk Through
Project Files
Konsulttjänster

A circular lined tunnel is constructed in saturated ground. The ground is dewatered during construction. The tunnel is supported by a temporary shotcrete liner, which is installed while the tunnel excavation is advanced. A final cast-in-place concrete liner is then constructed. The water level is then returned to the original level. The analysis determines the forces and moments that develop in the concrete liner when the water level is returned to the original level, and when the temporary shotcrete liner loses strength.

Keywords:

  • Circular
  • Tunnel
  • Saturated soil
  • Dewatering
  • shotcrete
  • concrete
  • liner

Materials:

  • Concrete
  • Soil
  • Water

Analyses:

  • Fluid Flow
  • Static
Senaste nytt
  • ITASCA Strengthens North American Delivery of Integrated Geomechanics and Hydrogeology Solutions Drawing on decades of geomechanical and hydrogeological expertise, ITASCA has announced the formation of ITASCA...
    Läs mer
  • Från arkitektdröm till bergmekanik – Adina Sköld stärker ITASCA i Luleå Hon sa aldrig Luleå. Aldrig jord och berg. Det var arkitekt hon skulle bli. I...
    Läs mer
  • Operativ bergmekanik På ITASCA gillar vi en blandning av fältjobb och analyser. Vi erbjuder stöd inom operativ...
    Läs mer

Kommande händelser
17 nov.
Visit ITASCA at Ground Support 2026
ITASCA will be participating in Ground Support 2026, the conference dedicated to ground support in mining and civil engineering, taking... Läs mer