Lined Tunnel Construction in Saturated Ground

Programvara

Version Notes:
FLAC 8.0

Level: Advanced
Runs in Demo: No

Write Up
Walk Through
Project Files
Konsulttjänster

A circular lined tunnel is constructed in saturated ground. The ground is dewatered during construction. The tunnel is supported by a temporary shotcrete liner, which is installed while the tunnel excavation is advanced. A final cast-in-place concrete liner is then constructed. The water level is then returned to the original level. The analysis determines the forces and moments that develop in the concrete liner when the water level is returned to the original level, and when the temporary shotcrete liner loses strength.

Keywords:

  • Circular
  • Tunnel
  • Saturated soil
  • Dewatering
  • shotcrete
  • concrete
  • liner

Materials:

  • Concrete
  • Soil
  • Water

Analyses:

  • Fluid Flow
  • Static
Senaste nytt
  • Från arkitektdröm till bergmekanik – Adina Sköld stärker ITASCA i Luleå Hon sa aldrig Luleå. Aldrig jord och berg. Det var arkitekt hon skulle bli. I...
    Läs mer
  • Operativ bergmekanik På ITASCA gillar vi en blandning av fältjobb och analyser. Vi erbjuder stöd inom operativ...
    Läs mer
  • Jennifer firar fem år med strategisk roll ...
    Läs mer

Kommande händelser
11 aug.
ITASCA Joins Caving 2026 as a Main Sponsor
We are pleased to announce that ITASCA will be participating as a Main Sponsor in Caving 2026, the leading international conference ded... Läs mer
15 sep.
ITASCA at EUROCK 2026: Advancing Innovation in Rock Engineering
ITASCA is pleased to announce its participation in EUROCK 2026 – ISRM Regional Symposium, taking place from 15–19 September 2026 in Sko... Läs mer
20 sep.
ITASCA to Participate in CouFrac 2026
ITASCA will be participating in CouFrac 2026, taking place from 20–23 September 2026 in Uppsala, Sweden. The conference brings together... Läs mer