Lined Tunnel Construction in Saturated Ground

Software

Version Notes:
FLAC 8.0

Level: Advanced
Runs in Demo: No

Write Up
Walk Through
Project Files
Consulting Services

A circular lined tunnel is constructed in saturated ground. The ground is dewatered during construction. The tunnel is supported by a temporary shotcrete liner, which is installed while the tunnel excavation is advanced. A final cast-in-place concrete liner is then constructed. The water level is then returned to the original level. The analysis determines the forces and moments that develop in the concrete liner when the water level is returned to the original level, and when the temporary shotcrete liner loses strength.

Keywords:

  • Circular
  • Tunnel
  • Saturated soil
  • Dewatering
  • shotcrete
  • concrete
  • liner

Materials:

  • Concrete
  • Soil
  • Water

Analyses:

  • Fluid Flow
  • Static
Latest News
  • Newsletter October 2023 ...
    Read More
  • Newsletter August 2023 ...
    Read More
  • New General Manager for ITASCA Sweden We have appointed a new GM in Sweden!...
    Read More

Upcoming Events
29 May
Getting Started with FLAC2D/FLAC3D
Objectives of the training: •Understand the FLAC2D/ FLAC3D numerical approach and the types ofproblems it can solve•Know how to manipul... Read More
5 Jun
IMAT Workshop
ITASCA is launching IMAT (Itasca's Mining Analysis Toolbox) our groundbreaking software tailored exclusively for underground and open p... Read More