Dewatered Construction of a Braced Excavation

Programvara

Version Notes:
FLAC 8.0

Level: Advanced
Runs in Demo: No

Write Up
Walk Through
Project Files
Konsulttjänster

A braced excavation is constructed in saturated ground. The construction stages, dewatering, excavation and braced support construction are simulated with FLAC. The purpose is to evaluate the deformation of the ground adjacent to the excavation and the performance of the wall and strut support. Three different material constitutive models are used to represent the soil behavior: Mohr-Coulomb, Cysoil, and PH models. The deformational response produced by these three models are compared.

Keywords:

  • Braced excavation
  • Saturated soil
  • Horizontal struts
  • Diaphram wall
  • support
  • Dewatering
  • Mohr-Coulomb model
  • Cysoil model
  • PH model
  • Plastic
  • Hardening
  • Construction sequence
  • Excavation
  • Settlement

Materials:

  • Clay
  • Sand
  • Soil
  • Water

Analyses:

  • Fluid Flow
  • Static
Senaste nytt
  • ITASCA Strengthens North American Delivery of Integrated Geomechanics and Hydrogeology Solutions Drawing on decades of geomechanical and hydrogeological expertise, ITASCA has announced the formation of ITASCA...
    Läs mer
  • Från arkitektdröm till bergmekanik – Adina Sköld stärker ITASCA i Luleå Hon sa aldrig Luleå. Aldrig jord och berg. Det var arkitekt hon skulle bli. I...
    Läs mer
  • Operativ bergmekanik På ITASCA gillar vi en blandning av fältjobb och analyser. Vi erbjuder stöd inom operativ...
    Läs mer

Kommande händelser
17 nov.
Visit ITASCA at Ground Support 2026
ITASCA will be participating in Ground Support 2026, the conference dedicated to ground support in mining and civil engineering, taking... Läs mer