Dewatered Construction of a Braced Excavation

Software

Version Notes:
FLAC 8.0

Level: Advanced
Runs in Demo: No

Write Up
Walk Through
Project Files
Consulting Services

A braced excavation is constructed in saturated ground. The construction stages, dewatering, excavation and braced support construction are simulated with FLAC. The purpose is to evaluate the deformation of the ground adjacent to the excavation and the performance of the wall and strut support. Three different material constitutive models are used to represent the soil behavior: Mohr-Coulomb, Cysoil, and PH models. The deformational response produced by these three models are compared.

Keywords:

  • Braced excavation
  • Saturated soil
  • Horizontal struts
  • Diaphram wall
  • support
  • Dewatering
  • Mohr-Coulomb model
  • Cysoil model
  • PH model
  • Plastic
  • Hardening
  • Construction sequence
  • Excavation
  • Settlement

Materials:

  • Clay
  • Sand
  • Soil
  • Water

Analyses:

  • Fluid Flow
  • Static
Latest News
  • WEBINAR: Solving Geothermal Challenges with XSite Numerical Modeling ITASCA Software and Baker Hughes are hosting a collaborative webinar to demonstrate how combining advanced...
    Read More
  • Newsletter October 2023 ...
    Read More
  • Newsletter August 2023 ...
    Read More

Upcoming Events
17 Nov
Visit ITASCA at Ground Support 2026
ITASCA will be participating in Ground Support 2026, the conference dedicated to ground support in mining and civil engineering, taking... Read More