Hydroelectric Power Plants

In addition to hydroelectric dams, Itasca has worked on hydroelectric power plants including a pumped storage plant in Israel (Gavet) and hydropower stations in China (Baihetan, JinPing), India, and Colombia (Guavio and Sogamoso). Engineering analyses include site characterization, review of in-situ stress measurements, ground support evaluation and recommendation, excavation stability of large caverns during prefeasibility and construction, and underground facility layout design, including surge chamber geometry.

Senaste nytt
  • ITASCA Strengthens North American Delivery of Integrated Geomechanics and Hydrogeology Solutions Drawing on decades of geomechanical and hydrogeological expertise, ITASCA has announced the formation of ITASCA...
    Läs mer
  • Från arkitektdröm till bergmekanik – Adina Sköld stärker ITASCA i Luleå Hon sa aldrig Luleå. Aldrig jord och berg. Det var arkitekt hon skulle bli. I...
    Läs mer
  • Operativ bergmekanik På ITASCA gillar vi en blandning av fältjobb och analyser. Vi erbjuder stöd inom operativ...
    Läs mer

Kommande händelser
26 okt.
ITASCA at Slope Stability 2026: Strategic Sponsor and Technical Contributor_2
ITASCA is proud to participate as a Strategic Sponsor in Slope Stability 2026, one of the world’s leading international symposiums focu... Läs mer
26 okt.
ITASCA at Slope Stability 2026: Strategic Sponsor and Technical Contributor
ITASCA is proud to participate as a Strategic Sponsor in Slope Stability 2026, one of the world’s leading international symposiums focu... Läs mer
8 nov.
ITASCA to Attend Tailings & Mine Waste 2026
This November, ITASCA will participate in Tailings & Mine Waste 2026 (TMW 2026), taking place from 8–11 November 2026 in Westminste... Läs mer